Title: | Scheduling, Material Requirement Plan (MRP) and Cash Outflow Analysis- a Case Study |
Authors: | Rohit J. Mehendale Aniket S. Patil |
Issue Date: | 2019 |
Publisher: | Journal of Construction Management |
Abstract: | Scheduling, Material Requirement Plan (MRP) and cash outflow analysis are some of the major elements which need to work out in a construction project. Generally, different softwares are available for each of this task. When there is a delay in the planned schedule, it is time consuming to get MRP and cash outflow plan updated according to the revised schedule. An ongoing Residential cum Commercial project located at Nasik has been taken up for the present case study. Microsoft Project software for Scheduling and Microsoft Excel software for MRP and cash outflow analysis have been adopted in the present study. As both the softwares are made by Microsoft, they have a built-in feature to interlink with each other. It is found when there is a delay in an activity; the schedule gets automatically updated by changing the starting date of the delayed activity. It is also found that it is easier to get the MRP and cash outflow to get updated according to the revised schedule. |
URI: | http://gnanaganga.inflibnet.ac.in:8080/jspui/handle/123456789/14806 |
Appears in Collections: | Articles to be qced |
Files in This Item:
File | Size | Format | |
---|---|---|---|
Scheduling, Material Requirement Plan (MRP) And.pdf Restricted Access | 3.19 MB | Adobe PDF | View/Open Request a copy |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.