Please use this identifier to cite or link to this item: https://gnanaganga.inflibnet.ac.in:8443/jspui/handle/123456789/1875
Full metadata record
DC FieldValueLanguage
dc.contributor.authorShwetank Parihar-
dc.contributor.authorChandan Bhar-
dc.date.accessioned2023-10-17T05:08:13Z-
dc.date.available2023-10-17T05:08:13Z-
dc.date.issued2017-
dc.identifier.urihttp://gnanaganga.inflibnet.ac.in:8080/jspui/handle/123456789/1875-
dc.description.abstractThis study is a step in the direction of automation and central control of a cable manufacturing unit. It includes literature review on issues like uncertainty and risk management in logistics related problems and their variations. The production related parameters were aligned together for designing a production line on ARENA simulation software. An innovative methodology was selected for simulation model in which the suppliers and warehouses were also included. A system was developed for each process of cable production unit. It was then simulated for different parameters for 10,000 hours and obsen1ations were made. The results derived from the simulations indicate that this system can be used for central monitoring and development for an assembly line manufacturing system subject to further improvement in logistics in the firm under the study.en_US
dc.language.isoen_USen_US
dc.publisherASBM Journal of Managementen_US
dc.subjectProduction managementen_US
dc.subjectSimulationen_US
dc.subjectCable manufacturing unitsen_US
dc.titleDevelopment of Centrally Controlled Production Management Methodology for Reducing Production Related Risks: Study of a Cablem Manufacturing Uniten_US
dc.typeArticleen_US
Appears in Collections:Article Archives

Files in This Item:
File Description SizeFormat 
DEVELO~1.PDF
  Restricted Access
Development of Centrally Controlled Producation2.18 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.