Please use this identifier to cite or link to this item:
https://gnanaganga.inflibnet.ac.in:8443/jspui/handle/123456789/7035
Title: | A Two Stage Tandem Repairable Remanufacturing System with Work-In-Process (Wip) Inventory Control |
Authors: | M. Jain G.C. Sharma |
Issue Date: | 2012 |
Publisher: | Science Technology and Management Journal of Aisect University |
Abstract: | This paper deals with an unreliable remanufacturing system involved in the processing and remanufacturing of WIP inventory. While processing the items to be recycled, the system may become out of order fo llowed by a two stage tandem repair. The system capacity K is assumed to be finite. As soon as the items start entering the system and queue up to seek service, the server takes some start up time to activate and then waits to serve until the N items of WIP inventory are accumulated. |
URI: | http://gnanaganga.inflibnet.ac.in:8080/jspui/handle/123456789/7035 |
Appears in Collections: | Articles to be qced |
Files in This Item:
File | Size | Format | |
---|---|---|---|
A TWO STAGE TANDEM REPAIRABLE REMANUFACTURING.pdf | 2.91 MB | Adobe PDF | View/Open |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.