Please use this identifier to cite or link to this item: https://gnanaganga.inflibnet.ac.in:8443/jspui/handle/123456789/7035
Title: A Two Stage Tandem Repairable Remanufacturing System with Work-In-Process (Wip) Inventory Control
Authors: M. Jain
G.C. Sharma
Issue Date: 2012
Publisher: Science Technology and Management Journal of Aisect University
Abstract: This paper deals with an unreliable remanufacturing system involved in the processing and remanufacturing of WIP inventory. While processing the items to be recycled, the system may become out of order fo llowed by a two stage tandem repair. The system capacity K is assumed to be finite. As soon as the items start entering the system and queue up to seek service, the server takes some start up time to activate and then waits to serve until the N items of WIP inventory are accumulated.
URI: http://gnanaganga.inflibnet.ac.in:8080/jspui/handle/123456789/7035
Appears in Collections:Articles to be qced

Files in This Item:
File SizeFormat 
A TWO STAGE TANDEM REPAIRABLE REMANUFACTURING.pdf2.91 MBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.