Please use this identifier to cite or link to this item: https://gnanaganga.inflibnet.ac.in:8443/jspui/handle/123456789/7035
Full metadata record
DC FieldValueLanguage
dc.contributor.authorM. Jain-
dc.contributor.authorG.C. Sharma-
dc.date.accessioned2024-02-27T06:05:25Z-
dc.date.available2024-02-27T06:05:25Z-
dc.date.issued2012-
dc.identifier.urihttp://gnanaganga.inflibnet.ac.in:8080/jspui/handle/123456789/7035-
dc.description.abstractThis paper deals with an unreliable remanufacturing system involved in the processing and remanufacturing of WIP inventory. While processing the items to be recycled, the system may become out of order followed by a two-stage tandem repair. The system capacity K is assumed to be finite. As soon as the items start entering the system and queue up to seek service, the server takes some start up time to activate and then waits to serve until the N items of WIP inventory are accumulated. Once the system becomes full, further arrival of items is not allowed until the queue length decreases to a prespecified level F. The time dependent behaviour of the system is analysed using Runge-Kutta 4'" order method. To explore the system's effectiveness, the model formulated has been tested numerically.-
dc.publisherScience Technology and Management Journal of Aisect University-
dc.titleA Two Stage Tandem Repairable Remanufacturing System with Work-In-Process (WIP) Inventory Control-
dc.volVol I-
dc.issuedNo II-
Appears in Collections:Articles to be qced

Files in This Item:
File SizeFormat 
A TWO STAGE TANDEM REPAIRABLE REMANUFACTURING.pdf
  Restricted Access
2.91 MBAdobe PDFView/Open Request a copy


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.